Case Studies

How to validate an uv‑c trolley in open‑plan offices using simple microbiology pass/fail criteria and downtime metrics

I recently completed a validation project for a UV‑C trolley in a large open‑plan office and I want to share the practical method I used, the microbiology pass/fail criteria I set, and the downtime metrics I measured. The aim was straightforward: demonstrate that the UV‑C trolley produced a reliable and repeatable reduction in environmental bioburden across representative workstations while...

Oct 09, 2026 • by Lucas Bernard
Read more...
How to validate an uv‑c trolley in open‑plan offices using simple microbiology pass/fail criteria and downtime metrics

Featured

Latest News from Bluebaycleaning Co

Understanding the french school calendar
Cleaning Tips

Understanding the french school calendar

For families, students, and teachers arriving in France or planning a stay in the country, understanding the school calendar is one of the first practical steps to take. The French education system follows a structure that may feel familiar in some ways and very different in others. School start...

Read more... →
How to run a 14‑day side‑by‑side trial of electrostatic sprayers vs manual disinfection in nursery rooms with clear pass/fail microbiology criteria
Case Studies

How to run a 14‑day side‑by‑side trial of electrostatic sprayers vs manual disinfection in nursery rooms with clear pass/fail microbiology criteria

I recently ran a practical 14‑day side‑by‑side trial comparing electrostatic sprayers and traditional manual disinfection in nursery rooms. The aim was simple: test whether an electrostatic system could deliver consistent microbiological control — and do so with clear, repeatable pass/fail...

Read more... →